After searching on e bay for a couple of years Direct Assembly Solutions finally found what it was looking for; 80 square metres of Static Dissipative flooring tiles. Removed from a company which relocated shortly after a new floor was laid these tiles were in excellent condition and looking for a new home.
After they arrived with us Gary was tasked with relaying the workshop floor and completed an excellent job in double quick time. We now have a floor to be proud of that goes a long way to professionalise our workshop and create a suitable environment for all types of electronic assembly, plus we have 40 square metres left for when we expand the workshop!!